Water Supply

UAHC Camp Coleman, Cleveland, GA

Background

This is a 250 acre recreation area, drawing visitors from around the world. The site includes a 20 acre lake, about 30 family cottages, dining facility, infirmary, etc. Complete Water Services assisted in the design and installation of a groundwater well and treatment system to supply the Camp with drinking and domestic water. Treatment includes sediment filtration, iron and manganese removal, pH adjustment and microbiological control. Services also included preparation ofan OEM Manual and plant startup.